Consultancy Services for Design, Survey and Preparation of and Plan for up gradation to 2 lane with paved shoulders of Belakeri Port to Kumta - Sirsi Road from Km. 0.000 to Km. 4.265 of Belakeri Port Link Road and from Km. 4.965 to Km. 60.000 of SH-69 (excluding stretch of NH 66) in the State of Karnataka work sums up to 59.300 km of road length.

Belakeri Port to Kumta - Sirsi Road from Km. 0.000 to Km. 4.265 of Belakeri Port Link Road.

About Project

Kumta - Sirsi Road Project

Belakeri Port to Kumta - Sirsi Road from Km. 0.000 to Km. 4.265 of Belakeri Port Link Road.

Project info
Client: National Highways, (NORTH) Bangalore.
Contractor: M/s RNS Infrastructure limited, Bangalore
Design Element: Minor Bridges, Box and Pipe Culverts
Cost: Rs 300.00 Cr