Consultancy Services for Design, Survey and Preparation of and Plan for Widening to Two Lane with Paved Shoulder from km 544.200 to km 594.000 on NH-150A of Hosamane Cross – Pandavapura Section in Karnataka Region for a Length of 50 Km – National Highways, PWD (Tumkur Division).

Preparation of and Plan for Widening to Two Lane with Paved Shoulder from km 544.200 to km 594.000 on NH-150A.

About Project

Hosamane Cross – Pandavapura Road Project

Preparation of and Plan for Widening to Two Lane with Paved Shoulder from km 544.200 to km 594.000 on NH-150A.

Project info
Client: National Highways, (MORTH) Bangalore.
Contractor: Sri Bapuji Constructions & H B Ravi Kumar JV
Design Element: Major Bridge, Minor Bridges, Box and Pipe Culverts
Cost: Rs 196.00 Cr