

Previous
Next
Survey, Investigation, Conceptualisation, Hydraulic designs, Detailed design of open Aqueduct of length 10.8Km, Design of all temporary structures such as scaffolding, moulds, shuttering schemes and Design of Hydraulically operated moulds for U Girders. The scope also involved design of full span partial Precast U Girders of 20m length and launching the same to a maximum height of 30m from ground level.
Management of Precast RCC Elevated Aqueduct carrying a discharge of 93.5Cumecs under Yettinahole Drinking water project.
About Project
PKG23 Project
Management of Precast RCC Elevated Aqueduct carrying a discharge of 93.5Cumecs under Yettinahole Drinking water project.
Project info
Client Visvesvaraya Jala Nigama Limited, Government of KarnatakaContractor BSR Infratech India Limited., Bangalore
Design Permanent shuttering for Pile cap, Barge design, U-Girder shuttering