CONSTRUCTION OF ELEVATED VIADUCT FOR BANGALORE METRO RAIL CORPORATION LIMITED AT PHASE 2A CH: 0+000 TO CH: 18.433 AND PHASE 2B-CH:0+000 TO 6+740.

About Project

BMRCL Project

CONSTRUCTION OF ELEVATED VIADUCT FOR BANGALORE METRO RAIL CORPORATION LIMITED AT PHASE 2A CH: 0+000 TO CH: 18.433 AND PHASE 2B-CH:0+000 TO 6+740.

Project info
Client Bangalore Metro Rail Corporation Ltd
Contractor M/s Shankarnarayana Constructions Pvt. Ltd., Bangalore
Project Type Casting Yard, U-Girder shuttering, Pier, Pier cap shuttering